Analysis and Discussion on the Definition of Sea Utilizing Mode for Cofferdam in Offshore Engineering Construction |
ZHANG Tonghui,YUE Wen,LI Huiquan |
Institute of land survey and Planning of Guangdong Province |
Abstract: |
The problems to define the sea utilizing mode of cofferdams in offshore engineering construction,such as land reclamation,sea crossing bridge and water conservancy engineering,were analyzed and discussed based on work practice.A solution to confirm the right by stages was proposed in view of the inconsistency of sea utilizing mode between the construction cofferdam and the design.It is expected to provide useful reference for maritime management and dynamic monitoring and surveillance of sea area use. |
Key words: Offshore engineering,Cofferdam,Sea utilizing mode,Right confirmation by stages,Maritime management |